Assembly: Tool Vault 84 Inch side locker

REQUIRED TOOLS

Phillips-Head Screwdriver, 10mm Wrench, 15mm Wrench

1. OPEN CARTON, REMOVE FROM PALLET

Cut all straps with the BOX CUTTER, then lift the cardboard packaging off the side locker. Remove side locker from pallet.


2. (OPTIONAL) REVERSE HANGER IF INSTALLING RIGHT SIDE LOCKER

By default, the door and hanger are configured as a left side locker. If you are installing the side locker to the right side of the toolbox, you will need to reverse the hanger, then later reverse the door towards the end of this guide. First you will need to remove the hanger from the right panel, unfasten each bolt with washer. Use the existing WASHERS and M6x12 HEX BOLTS to fasten the HANGER to the left side locker panel that faces the right side of the tool box.


3. INSTALL THE EVA LINER, REMOVE SHELVES AND DRAWERS

Place both LINERS on the side with the hanger, near the bottom of the side locker. Remove all shelves and drawers from inside of the side locker to prepare for a later step.


4. HANG SIDE LOCKER

Hang the side locker off the top edge of the roller cabinet.


5. FASTEN SIDE LOCKER TO TOOL BOX

Open the door of the side locker. Inside, find the 4 bolt holes that connect to the weld nuts on the roller cabinet. Thread each M6x20 BOLT through a SPRING WASHER, then a WASHER. Fasten each washer equipped bolt to the 4 weld nuts.


6. INSTALL CONNECTION CHANNEL


7. remove temporary, non spring casterS and steel base

The temporary casters are no longer required. They can be removed along with the steel base just above the caster.


Shopping Cart